Disclosed is a method for preparing a concrete-filled steel tubular edge-constrained laminated shear wall, belonging to the field of prefabricated buildings. The method allows for integrated hoisting during installation, leading to a simple working procedure and easy quality control. During manufacturing, an interior wythe board is flipped and placed on supporting members on rectangular steel tubes, no cavity formwork or bracket is needed in a cavity, and thus an operation of pulling out the cavity formwork is avoided, and high production efficiency is achieved. The rectangular steel tubes can be welded to horizontal steel bars of interior and exterior wythe boards, avoiding the cumbersome working procedure and high cost caused by stud connection while achieving reliable connection and direct force transmission.